This project consists of:-

1. office building

                It is a mezzanine floor with an area of ​​400 square meters. It was installed inside the basement, whose area was estimated with more than five thousand square meters (it was implemented by Jet Trading and Contracting Company). However, the difficulty of this building lies in its installation after the completion of the concrete structure and the entire basement roof, where We suspended the iron structure from the bottom of the basement ceiling, and due to the impossibility of entering cranes or heavy equipment inside the basement, our company was resorted to for implementation and we sold and installed manual equipment as this type of facility needs great expertise, knowing that this role has been designed according to the Egyptian standard specifications for office loads.

 

2. Boiler Building

              This building was designed with high efficiency because the boiler buildings are liable to explosion and need a special design that allows the building to be volatilized when the explosion, while reducing the losses of human lives.